About The Project

ElekEn Associates

23 Feb 2017

The state of the art centrally air-conditioned Mall has B+LG+G+2 floors with built-up area about ------ sft.
The project has 100% back-up power through Diesel Generators installed on the roof top of building.
Total connected load is about 923 KW
    
Scope of ElekEn's Services:
Electrical and Allied Engineering Services: Concept, Design Development and Top Supervision.

Salient Features

ElekEn Associates

23 Feb 2017

Centralized Lighting Control using programmable relays connected through UTP cable

Cost of central battery system for emergency lighting has been reduced substantially by making some logics using C-Bus System.

Low Voltage System

ElekEn Associates

23 Feb 2017

Lightning Protection
Stand-by Power generation
Power Distribution
Lighting & Power Systems and    Control
Emergency Lighting

Low Current System

ElekEn Associates

23 Feb 2017

Voice, Data and Communication.
CCTV System
MATV System
Fire Alarm System
Public Address System
UPS System

COMMENTS

YOU MAY ALSO BE INTERESTED IN

Al Habib Super Mall Burewala, Pakistan

Mall Road Lahore, Pakistan

Islamabad Express Way Islamabad, Pakistan

Al-Anayat Mall Islamabad, Pakistan

  • LAUNCH DATE

    15 March, 2010

Features

  • Balcony or Terrace

  • Parking Spaces

  • Waste Disposal

  • Sewerage

  • Electricity

  • Water Supply

  • Sui Gas

  • Community Lawn or Garden

  • Kids Play Area

FACILITIES

  • Water Supply
  • Sewarage
  • Mosque
  • School
  • Gas
  • Electricity
  • Park
  • Telephone

LATEST PROJECTS

Albums

COMMENTS

Featured Projects
Featured Projects
Featured Projects
Featured Projects

CONTACT

rightproperty.pk

CONTACT DETAIL

rightproperty.pk
rightproperty.pk Jinnah Shopping Mall
rightproperty.pk 922134551602
rightproperty.pk Aziz Bhatti Road, cantt Quetta